newstodate.aero
Dec 17, 2013 (newstodate): Boeing has now started assembling the sixth Dreamliner for the Polish carrier LOT.
The Boeing 787-8 will be delivered to LOT by late March or early April 2014, adding to the fleet of five aircraft already with the airline.
LOT has placed orders for a total of eight Dreamliners, and the airline is reportedly considering whether to convert to remaining two aircraft to the larger Boeing 878-9 version.
The Boeing 787-8 will be delivered to LOT by late March or early April 2014, adding to the fleet of five aircraft already with the airline.
LOT has placed orders for a total of eight Dreamliners, and the airline is reportedly considering whether to convert to remaining two aircraft to the larger Boeing 878-9 version.